Skip to content
CommunifyCommunify.us

Search Communify

Try searching for "4DX", "risk register", "tracer", or "hand hygiene".
Press Ctrl/⌘ K or / from anywhere to open search.

Improvement method

DMAIC and Six Sigma in healthcare

For quality analysts, Six Sigma practitioners and quality directors

DMAIC (Define, Measure, Analyze, Improve, Control) is the Six Sigma method for problems where the cause isn't obvious and the data can reveal it. This guide walks through each phase, when DMAIC is worth its extra rigor, a published multi-hospital example, and why so many healthcare projects stall at Measure or fade after Control.

3 min read · Reviewed November 1, 2026

An infection prevention nurse with a tally sheet and a quality analyst with a laptop run chart collect baseline data beside a central line supply cart in an ICU hallway
The DMAIC Improvement FrameworkA data-driven method for improving an existing processDefineProblem, goaland scopeMeasureMeasure thebaselineAnalyzeVerify rootcausesImproveTest and rollout fixesControlSustain thegainsDefine Measure Analyze Improve Control
The five DMAIC phases: define, measure, analyze, improve and control.

Key takeaways

  • Use DMAIC when the cause is genuinely unknown and you can measure the process. Simpler problems suit a PDSA cycle or an A3.
  • Agree operational definitions before collecting data, so the baseline and follow-up measure the same thing.
  • Expect different causes in different places. In a Joint Commission hand hygiene project, each hospital had its own key causes.
  • Write a control plan with a named owner for each measure, and keep reviewing it after the project closes.

What DMAIC is

DMAIC (Define, Measure, Analyze, Improve, Control) is the improvement method at the core of Six Sigma. Six Sigma was developed at Motorola in the 1980s and popularized by General Electric in the 1990s. Where lean focuses on removing waste and improving flow, Six Sigma focuses on reducing variation and defects. The name refers to a process capable of no more than 3.4 defects per million opportunities.

  • Define: state the problem, the goal and the scope in measurable terms, with a sponsor and a team.
  • Measure: agree how each measure is defined, check that the data can be trusted, and establish a baseline.
  • Analyze: use data to find and confirm the causes that matter most, rather than the ones the team suspects.
  • Improve: design, test and implement changes that address the confirmed causes.
  • Control: put monitoring, standard work and a response plan in place so the gains hold.

When DMAIC is worth the extra rigor

DMAIC is heavier than a PDSA cycle or an A3. It fits problems where the cause is genuinely unknown, the process can be measured, and there is enough data to separate real causes from noise, such as infection rates, medication errors, readmissions or billing errors. When the cause is fairly clear and the fix can be tested quickly, PDSA cycles get there faster.

Many healthcare organizations combine the two traditions as lean Six Sigma: lean tools for flow and quick wins, and Six Sigma's statistical discipline for the harder, data-heavy questions.

ImprovementFlow

Quality Reporting

Quality Reporting gives each measure a definition, a named owner and a review cadence, and links an off-target metric to the improvement project addressing it, which is what the Measure and Control phases need.

An example: hand hygiene at eight hospitals

From 2008 to 2010, The Joint Commission Center for Transforming Healthcare ran a hand hygiene project with eight US hospitals using robust process improvement, its combination of lean, Six Sigma and change management. Careful measurement showed that baseline compliance averaged 47.5%, far below what the hospitals had believed.

The analysis found 41 different causes of noncompliance, and each hospital had its own set of key causes. Each hospital targeted its own causes, and compliance rose to an average of 81.0%, sustained for 11 months through the end of the project.

Where DMAIC projects stall

The most common sticking point is Measure. Teams often find that the data they need doesn't exist in usable form, is collected inconsistently, or must be pulled by hand from several systems. Weeks go into assembling a baseline, spreadsheets are rebuilt for each project, and definitions differ from one project to the next.

The second sticking point is Control. The monitoring plan lives in a spreadsheet someone updates when they remember, and once the project closes, nobody owns the measure. The method is sound; it needs measures with clear definitions and owners that last beyond the project.

  • Write an operational definition for each measure before collecting data.
  • Check the measurement itself: two observers should record the same result.
  • Name an owner for every control measure and set a review cadence.
  • Decide in advance what happens when the measure drifts.

How ImprovementFlow supports Measure and Control

  • Teams define the metrics they manage, and each metric has a named owner who sees it on their dashboard.
  • Each metric is reviewed at the right cadence: daily on the unit's huddle board, weekly by the department and monthly by leadership and the quality committee.
  • An off-target metric can be linked to the improvement project addressing it, so the committee can see whether the fix is moving the number.
  • Improvement Projects supports DMAIC alongside A3s and PDSA cycles, with tools such as fishbone diagrams, FMEA and process mapping.

Contact us

Bring your monthly quality packet. We'll show you the live version.

Tell us which measures your committee reviews, who reports them and where they wait. We'll walk through how teams keep them current, how they roll up across sites and service lines, and how they connect to the work that moves them.

We typically respond within one business day.

Prefer email? info@communify.us

Explore Quality Reporting →