Key takeaways
- Scope one bounded process with a clear measure. Broad themes like "patient flow" are too big for a single week.
- Do the preparation: a sponsor, baseline data, the right frontline staff and cover for their shifts.
- Use events for larger redesigns alongside daily improvement, not instead of it.
- Plan the follow-up before the event starts: open items with owners, and a 30-day review of the measures.
What a kaizen event is
Kaizen is the Japanese term for continuous improvement. The Lean Enterprise Institute defines it as the continuous improvement of an entire value stream or an individual process to create more value with less waste. A kaizen event, also called a rapid improvement event, rapid process improvement workshop or kaizen workshop, is a short, intensive version: a cross-functional team spends three to five days on one process, studies it, designs and tests changes, and puts the new way of working in place before the week ends.
Lean practitioners are clear that events are not the whole of kaizen. They suit larger redesigns, but they are no substitute for the small improvements frontline teams make every day.
Virginia Mason Medical Center in Seattle has run its management system on the Toyota model since 2002, with rapid process improvement workshops at its center. IHI's 2005 white paper Going Lean in Health Care reported results from Virginia Mason's first 175 workshops, including inventory down 53%, floor space down 41%, lead time down 65% and staff walking distance down 44%. By freeing capacity, Virginia Mason also avoided planned capital spending, including $6 million for new surgery suites.
The three phases of a kaizen event
Preparation
Most of an event's success is decided before it starts. The diagram shows one to two weeks of preparation, but healthcare organizations often allow several weeks to agree the scope and goal with a sponsor, gather baseline data, choose the team and arrange cover for frontline staff's shifts.
Event week
A typical five-day event moves from understanding to standardizing:
- 1Map the current state, ideally by watching the process on the unit.
- 2Analyze causes and design changes.
- 3Put the changes in place, often as quick trials.
- 4Test and refine them with the staff who will use them.
- 5Present results to leaders and write down the new standard work.
Follow-up
Items the team could not finish during the week go on an action list with owners and dates. A review at about 30 days checks the measures and whether the new standard is being followed, and many organizations review again at 60 and 90 days.
ImprovementFlow
Improvement Projects
Improvement Projects keeps a kaizen event's measures, open action items and follow-up reviews on the project after event week, so the team can record whether the change was sustained.
Adapting kaizen to clinical settings
Healthcare can't stop the line to run an event. Patients keep arriving, so teams test changes during quieter periods, use simulation where a live test isn't safe, and plan staffing so frontline participants are truly released from their shifts. Changes that touch clinical care need the right clinical review before they go live.
The events that work best share a few traits: a specific, bounded process rather than a broad theme; frontline staff who do the work; an executive sponsor who can remove barriers during the week; and a concrete plan for sustaining the change.
Common healthcare targets include:
- Emergency department flow, from arrival to disposition.
- Operating room turnover and first-case delays.
- Medication administration and delivery.
- Discharge, from the decision to discharge to the patient leaving.
- Sterile processing, including instrument errors and turnaround time.
Why gains fade after event week
Teams leave an event energized, the new process is in place and the early numbers look good. Then the 30-day follow-up lives in someone's calendar, the chart is updated once, and the new standard work sits in a shared drive. Without scheduled reviews, visible measures and someone accountable for the new standard, staff drift back to old habits and the gains erode within months.
How ImprovementFlow supports kaizen follow-up
- The event's measures stay on the project, with starting, current and goal values, after the week is over.
- Open action items carry an owner, a team and a due date.
- Follow-up reviews record whether the change was sustained, and lessons learned are captured for other teams and sites.
- A project's scoreboard can be shown on a read-only display on the unit, so staff can see how the measures are moving.