Analysis tool

Fault tree analysis for patient safety

For patient safety, clinical engineering and quality leaders

Fault tree analysis starts from a serious outcome and works backward through AND and OR gates to every combination of failures that could cause it. This guide explains the method's engineering origins, how to find single points of failure, and how healthcare teams use it to check that their defenses cover every credible path.

3 min read · Reviewed November 1, 2026

At night at a progressive care unit's central monitoring station, a nurse manager sketches a branching fault tree on a whiteboard with a clinical engineer while a charge nurse points to a monitor
Fault Tree AnalysisTOP EVENTPatient receives the wrong medicationORWrong drug selectedANDWrong patient identifiedANDLook-alike packagingBarcode scan skippedSimilar patient namesID not checkedEventBasic eventOR gate: any one inputAND gate: all inputs together
An example fault tree for a patient receiving the wrong medication, showing how OR and AND gates combine basic events.

Key takeaways

  • An AND gate is a defense in depth: block any one input and the event above can't happen.
  • An OR gate is a set of independent paths: each one needs its own control.
  • Look first for single points of failure and events shared by many paths.
  • Use a fault tree to check whether an FMEA's mitigations cover every credible path to harm.

What fault tree analysis is

Fault tree analysis (FTA) is a top-down, deductive method. It starts with an undesired outcome, the top event, and works backward through logic gates to identify every combination of failures and conditions that could produce it. H.A. Watson developed it at Bell Telephone Laboratories in 1961–62 to evaluate the Minuteman missile launch control system for the US Air Force. It became standard in nuclear power, through the NRC's Fault Tree Handbook (NUREG-0492, 1981), and in aerospace, through NASA's 2002 update.

The gates are what set FTA apart from a fishbone. An AND gate means every input below it must occur for the event above to happen, so preventing any one input prevents that event. An OR gate means any single input is enough, so every input must be addressed. Working through the tree reveals the minimal cut sets: the smallest combinations of basic events that produce the top event. A cut set with only one event is a single point of failure.

FTA complements FMEA. FMEA works bottom-up, from each step or component to its effects; FTA works top-down, from a catastrophic outcome to its causes. Used together, the fault tree can show whether the FMEA's mitigations cover every credible path to the outcome. In healthcare, FTA is mostly used qualitatively, because reliable failure probabilities are rarely available.

Sources

When to use fault tree analysis

Use FTA for high-consequence outcomes that could arise from several independent failure paths, where leaders need confidence that defenses cover all credible paths and not just the obvious one: catastrophic patient harm, system-wide failures, never events. It is also a useful check on an FMEA: a path in the tree that the FMEA didn't address is a gap in the mitigation plan.

FTA takes more time, analytical skill and data than simpler tools. Reserve it for risks where the potential consequence justifies that investment.

ImprovementFlow

Improvement Projects

When a fault tree points to a failure pathway that needs fixing, Improvement Projects gives the mitigation an owner, linked measures and a follow-up review to confirm it held.

How to build a fault tree

  1. 1Define the top event precisely, including a time window or threshold where relevant.
  2. 2Ask what immediate events could cause it, and whether they need to happen together (AND) or whether any one is enough (OR).
  3. 3Keep decomposing each intermediate event until you reach basic events: individual failures or conditions you can act on.
  4. 4Identify the minimal cut sets, and look especially for single-event cut sets and for events that appear in many cut sets.
  5. 5Check the tree against reality: event reports, near misses and the people who run the process.
  6. 6Target mitigations at single points of failure first, then at events shared by many paths.

Example: missed patient deterioration on a progressive care unit

This is an illustrative example. A clinical engineering and patient safety team builds a fault tree for a redesigned progressive care unit. The top event: rapid deterioration not recognized within 15 minutes.

Three branches feed an OR gate: monitoring failure (an AND gate: the primary monitor alarm and the backup alert must both fail), assessment failure (an OR gate: missing any one of several assessment triggers is enough), and communication failure (an AND gate: both the automated alert and the manual escalation path must fail).

Tracing the communication branch reveals a hidden dependency. Overnight, the manual escalation path relies on a charge nurse who also carries a full patient assignment, so at high census the backup is unavailable exactly when monitoring is most stretched. The team makes the overnight charge role a dedicated oversight role.

How ImprovementFlow supports this

  • Fault tree findings can become an Improvement Projects A3, with the failure pathway as the reason for action and each mitigation as a plan step with an owner, a team and a due date.
  • A project can be linked to the safety events that point to a failure pathway, so the team works from real reports rather than assumptions.
  • Linked metrics and follow-up reviews show whether the mitigation held after the change.

Contact us

Give your next A3 a path to results that last

Tell us how your teams run A3s and PDSA cycles today, and where projects tend to stall. We'll walk through one of your projects from reason for action to confirmed result.

We typically respond within one business day.

Prefer email? info@communify.us

Explore Improvement Projects →